Liberia / Since 2018
Growing a beverage business together in Liberia.
A partnership that began with a 4,000 BPH carbonated-drink line in 2018 and expanded into PET bottles, cans, water and wine, with further projects through 2024.
Discuss your beverage project Explore the project timeline01 / A continuing partnership
From a first line to successive expansions.
The relationship began in 2018 with a 4,000 BPH PET carbonated-beverage filling line. As the customer’s business developed, further orders added higher-capacity carbonated-drink lines, can filling, bottled-water lines and wine filling.
The customer’s beverage portfolio includes still water, carbonated drinks, wine and juice. Equipment supply and upgrades continued through the project stages documented from 2018 to 2024.
Working together since 2018
02 / Project timeline
Growing capacity. Broadening the range.
Each stage below records the equipment supplied in that year. Outputs apply to the individual lines; BPH means bottles per hour.
- 2018
The first carbonated-drink line
- PET carbonated beverages
- 4,000 BPH
- 2019
More capacity, a new package format
- PET carbonated beverages
- 8,000 BPH
- Canned carbonated beverages
- 12,000 cans/hour
- 2021
Water, wine and treatment
Existing-line upgrades were also included.
- PET bottled water
- 12,000 BPH
- Wine filling
- 6,000 BPH
- Water treatment system
- 16T
- 2022
Further carbonated-drink capacity
Alongside upgrades to existing equipment.
- PET carbonated beverages
- 12,000 BPH
- 2024
Expanding water production
With further existing-line upgrades.
- PET bottled water
- 18,000 BPH
- 19 L PET bottled water
- 500 BPH
03 / Delivery & engineering support
Working through the disruption together.
During the COVID-19 period, Planet Machinery completed an order within one month and shipped the equipment before transport disruption affected the schedule. According to the project account, the customer received the machinery in time for its production plans.
Travel restrictions also made installation support difficult. Planet Machinery nevertheless sent an engineer to help install the lines, supporting the customer’s production schedule and strengthening the working relationship.
- Coordinated manufacturing and dispatch
- Protective packing and container loading
- On-site engineering support during travel restrictions
04 / Manufacturing & delivery
From factory inspection to site arrival.
The project photographs document the customer inspecting equipment at Planet Machinery, machinery manufacturing, bottle samples, protective loading and equipment after arrival at the customer’s factory.
05 / Production-line layout
Planning the equipment around the site.
The project record includes this layout showing an equipment arrangement and warehouse area. Enlarge the drawing to inspect the full plan.
Discuss your factory layoutProject gallery / 08 images
The work behind the partnership.
Customer visits, bottle samples, equipment manufacturing, protective loading and delivery to the factory.
Select any image to enlargeYour next stage of growth
Plan your beverage production project.
Share your beverage, package formats, target output and expansion plans. Use the Liberia partnership as a project reference.