Resources

Better line decisions start here.

Download the catalogue and line spec sheets, see delivered projects and get straight answers before you plan your next beverage line.

01 / Downloads

Documents behind your line.

Download what is published. For the rest, add it to your request list and our engineers email it, usually within 24 h.

Featured · PDF

Product catalogue

Every beverage line and individual machine we build, with output ranges and container formats.

ENDownload PDF

Line spec sheets

  • DOC-W01 · Water · PET bottlePET bottle water line
  • DOC-W02 · Water · Glass bottleGlass bottle water line
  • DOC-W03 · Water · 5 gallon5 gallon water line
  • DOC-W04 · Water · PET bottle5–19 L PET water line
  • DOC-C01 · CSD · PET bottlePET bottle CSD line
  • DOC-C02 · CSD · Glass bottleGlass bottle CSD line
  • DOC-C03 · CSD · CanCan CSD line
  • DOC-J01 · Juice & tea · PET bottleHot-fill juice & tea line
  • DOC-J02 · Juice & tea · PET bottleAseptic juice & tea line
  • DOC-B01 · Beer · Glass bottleGlass bottle beer line
  • DOC-B02 · Beer · CanCan beer line
  • DOC-B03 · Beer · PET bottlePET beer line

Plant planning pack

For the building stage. Sent to a company email address.

  • DOC-P01 · DWG / PDFLine layout drawings
  • DOC-P02 · XLSX / PDFUtility requirement table — water, power, steam, air
  • DOC-P03 · PDFFoundation loads and embedded parts
  • DOC-P04 · PDFWorkshop height and logistics aisles
04 / Videos

Machines running.

Unedited footage from our workshop and customer lines.

Line runningPET CSD rinsing, filling and capping
Line runningPET preforms through production equipment
05 / FAQ

Before you request.

The questions that come up in almost every project email.

Delivery

What do you need from us before a layout can be drawn?

Product and container specification, target output on the main size, building dimensions with column positions, and where water, power, steam and air enter the building. Plant-planning documents →

Commercial

Can we visit the factory before ordering?

Yes. Tell us your dates and the line you are planning, and we will arrange the visit in Suzhou. About the company →

After-sales

Can you upgrade a line that is already running?

Yes — format changeovers, capacity increases and control upgrades, after a survey of the existing machines. Retrofit and upgrades →

Glossary

BPH
Bottles per hour — rated output, always stated for a specific container size.
CIP
Clean-in-place: tanks, pipes and filler cleaned internally without dismantling.
SIP
Sterilise-in-place: the CIP circuit taken to sterilising temperature, used on aseptic lines.
Isobaric filling
Counter-pressure filling: bottle and filler bowl at equal CO₂ pressure so carbonated product does not foam.
Hot-fill
Product filled at high temperature so the heat sterilises the container; needs heat-set PET.
Aseptic filling
Sterile product filled into sterilised containers inside a sterile zone.
Level control
Filling to a fixed height in the neck rather than to a fixed volume.
Torque control
Cap applied to a set tightening torque, usually by magnetic or servo capping heads.
Change parts
Size-specific star wheels and guides swapped when the line runs another container.
FAT / SAT
Factory and site acceptance tests: the line checked before shipment, then again after installation.
Start a project

Bring us the product,
package and output.

Send us the product, package format and target output. We return a line configuration and budgetary quote.

Response time
≤ 24 h
Deliverable
Layout + budgetary quote
NDA
Available on request
Line inquiryEngineering response within 24 h